I think Reports could be so much more powerfull if it were possible to EDIT the values that are reported and those values get written back into the file.
This would be very similar to how Schedules behave in Openbuildings Designer as well as many other (BIM)/CAD design software.
I agree. having to use the Property dialog to edit the values one by one is very slow. we need to be able to edit the values in the report and send the edits back to the elements
Ian